How it works

From first call to first sunlight.

A walk-through of how BrightArc designs, installs and supports your solar system over its 25-year life.

The process

Five careful steps from first chai to first sunlight.

  1. 01

    Consultation

    A short call to understand your bill, load and goals. No pressure, no jargon.

  2. 02

    Site Survey

    Our engineers visit your roof, measure shading and design a layout — free.

  3. 03

    Design & EPC

    A signed-off engineering plan, component spec sheet and transparent quote.

  4. 04

    Installation

    Certified crew installs in 3–7 days. We handle LESCO net-metering paperwork.

  5. 05

    Savings

    App-based monitoring, 25-year warranty and 10-year O&M coverage.

Net metering

The bit nobody else does properly.

Net metering is how your excess solar power sells back to the grid. It's also where most providers in Pakistan disappear after installation.

BrightArc files your NEPRA application, your single-line diagram, your equipment datasheets, and follows up at LESCO weekly. Average approval: 4–6 weeks.

Ask about your meter
  1. 1
    NEPRA distribution licensee application

    Filed by BrightArc, signed by you

  2. 2
    Single-line diagram + equipment spec submission

    All Tier-1 spec sheets attached

  3. 3
    LESCO site inspection

    We host the engineer, you don't need to be there

  4. 4
    Bi-directional meter installation

    Replaces your standard meter

  5. 5
    Net-metering agreement signing

    3-year auto-renewable contract

FAQ

Common questions, honest answers.

Will solar really cut my bill by 80%?

For most homes in Lahore, yes — with a hybrid system sized to your daytime load. We share a transparent simulation before you sign anything.

How long does net-metering take?

On average, 4–6 weeks with LESCO after the system is commissioned. BrightArc files and follows up on your behalf at no extra cost.

What happens during load-shedding?

On a hybrid system with battery, your essential loads keep running silently. On-grid only systems will shut off during outages by design (anti-islanding).

What's the lifetime of the system?

Panels carry a 25–30 year linear performance warranty; inverters 10 years (extendable to 25); batteries 6,000+ cycles (10 yr). The system stays useful for 25+ years.

Do you finance?

Yes — we partner with leading Pakistani banks for solar financing on 24/36/48-month plans. Commercial PPA models also available.

Ready to save

Stop paying high bills.

Share a few details and we'll send your potential savings, a recommended system size, and an indicative quote — straight to WhatsApp.

  • Free site survey across Lahore
  • Indicative quote within 24 hours
  • Net-metering filing included
  • No-obligation — talk to an engineer, not a salesperson
Get your free solar report
Tell us about your place.

Submission opens WhatsApp with your details pre-filled. We reply within a few hours.

BrightArc Sales
Typically replies in minutes

Salam! Tell us your monthly bill or roof size and we'll send a tailored solar plan and pricing on WhatsApp.

Start chat

Mon – Sat · 11 am – 9 pm PKT